Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 16 results ...

Ahn, S, Lee, S and Steel, R P (2014) Construction Workers’ Perceptions and Attitudes toward Social Norms as Predictors of Their Absence Behavior. Journal of Construction Engineering and Management, 140(05).

Anh Tuan, B L, Tesfamariam, M G, Chen, Y, Hwang, C, Lin, K and Young, M (2014) Production of Lightweight Aggregate from Sewage Sludge and Reservoir Sediment for High-Flowing Concrete. Journal of Construction Engineering and Management, 140(05).

Anjaneyappa, V, Amarnath, M S and Srinivasamurthy, B R (2014) Compacting Characteristics of Light Compacting Equipment. Journal of Construction Engineering and Management, 140(05).

Chen, L and Manley, K (2014) Validation of an Instrument to Measure Governance and Performance on Collaborative Infrastructure Projects. Journal of Construction Engineering and Management, 140(05).

Dadi, G B, Goodrum, P M, Taylor, T R B and Carswell, C M (2014) Cognitive Workload Demands Using 2D and 3D Spatial Engineering Information Formats. Journal of Construction Engineering and Management, 140(05).

  • Type: Journal Article
  • Keywords: Labor; Productivity; Information management; Human factors; Construction management; Personnel management; Productivity; Information management; Mental workload; Analysis of variance; Additive manufacturing; Labor and personnel issues;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000827
  • Abstract:
    Construction project performance is significantly reliant on the effective communication of the project’s design to the end construction worker. Spatial design is frequently represented in two-dimensional (2D) drawings of various views. These views must be combined and decoded by the end user to effectively understand all orientations of a building element and can lead to errors. Advances in three-dimensional computer-aided design (3D CAD) and 3D printing have provided promising advancements in the presentation of spatial engineering information. This research investigates cognitive-workload demands of each information format. Cognitive workload is the amount of mental resources required to complete a task from the total available mental resources. Asking subjects to complete a reconstructing task of a simple structure using 2D drawings, a 3D CAD interface, and a 3D printed model introduces the individuals to alternative forms of information presentation. After completing the task, the subjects were surveyed on their perceptions of mental workload in six main factors using the NASA Task Load Index (TLX). Through a statistical analysis, there was no difference in mental workload between the three types of information presentation, indicating that the cognitive demands of the mediums are similar. However, there were statistically significant differences in workload factors due to demographic influences, such as occupation and CAD experience levels. In addition, mental workload affected the subject’s productivity in task completion. The primary contribution to the overall body of knowledge is the investigation of mental workload as a factor in spatial understanding, and more specifically, identifying cognitive demands of individuals when presented with spatial engineering information in various formats.

Heravi, G and Jafari, A (2014) Cost of Quality Evaluation in Mass-Housing Projects in Developing Countries. Journal of Construction Engineering and Management, 140(05).

Hu, D and Mohamed, Y (2014) Simulation-Model-Structuring Methodology for Industrial Construction Fabrication Shops. Journal of Construction Engineering and Management, 140(05).

Huang, Y and Pi, C (2014) Real-Option Valuation of Build-Operate-Transfer Infrastructure Projects under Performance Bonding. Journal of Construction Engineering and Management, 140(05).

Kim, J, Greene, M and Kim, S (2014) Cost Comparative Analysis of a New Green Building Code for Residential Project Development. Journal of Construction Engineering and Management, 140(05).

Kim, T W and Fischer, M (2014) Automated Generation of User Activity–Space Pairs in Space-Use Analysis. Journal of Construction Engineering and Management, 140(05).

Li, M, Chen, J, Xu, A, Xia, X and Wang, J (2014) Case Study of Innovative Top-Down Construction Method with Channel-Type Excavation. Journal of Construction Engineering and Management, 140(05).

Rajan, T A, Gopinath, G and Behera, M (2014) PPPs and Project Overruns: Evidence from Road Projects in India. Journal of Construction Engineering and Management, 140(05).

Sousa, V, Almeida, N M, Dias, L A and Branco, F A (2014) Risk-Informed Time-Cost Relationship Models for Sanitation Projects. Journal of Construction Engineering and Management, 140(05).

Wang, Y, Zhu, S and Wong, A S T (2014) Cooling Time Estimation of Newly Placed Hot-Mix Asphalt Pavement in Different Weather Conditions. Journal of Construction Engineering and Management, 140(05).

Xiong, W and Zhang, X (2014) Concession Renegotiation Models for Projects Developed through Public-Private Partnerships. Journal of Construction Engineering and Management, 140(05).

Xu, J and Song, X (2014) Suggestions for Temporary Construction Facilities’ Layout Problems in Large-Scale Construction Projects. Journal of Construction Engineering and Management, 140(05).